In November 2019, the first stage of the expansion of the poviat road no 1282 B Krynki – Kruszyniany – Łużany – Bobrowniki was completed. The first stage of the expansion covered 2,26 km from the junction with the commune road no 105067 B near Bobrowniki in the direction of Łużany. The expanded road has a 6-metre-wide asphalt surface and 1,5 – metre- wide soil shoulders. Two culverts were made as part of the first stage.
The second stage of the redevelopment will cover the remaining part of the poviat road – to the border with the Sokółka Poviat and will be carried out in 2020. The total length of the redeveloped section is 4,79 km.